A scope of work is the document that turns a water loss into a list of tasks. Reading it well in Oswego or anywhere else means knowing what each line is, how units work and what is missing. This guide goes through the parts in the order they usually appear, so you can ask about anything unclear before work starts and before payments are made.
The common parts of a scope
- Header: address, date of loss, cause of loss and water category.
- Affected areas: rooms and approximate square feet.
- Emergency services: extraction, protection, containment.
- Demolition: materials removed, with units.
- Drying plan: equipment, days and monitoring.
- Cleaning: surfaces and contents.
- Repairs or exclusions.
- Terms: change orders, payment and access.
Reading the units
| Unit | Meaning | Example |
|---|---|---|
| SF | Square feet | Drywall or flooring removed. |
| LF | Linear feet | Baseboard or a cut line on a wall. |
| EA | Each | A door, an outlet cover or a piece of equipment. |
| Day | One day of use | Air mover or dehumidifier. |
| Hour | Labor time | Cleaning or monitoring. |
If a scope lists drywall removal in square feet, check that the number matches the rooms. If it lists equipment days, ask how many pieces of equipment and why. Equipment should match the cubic footage and the wet materials. A scope that lists a lump sum without units gives you nothing to compare.
Drying goals and monitoring
A solid drying plan names the goal and how it is checked. The IICRC S500 standard bases the goal on a dry reference reading, so the plan should say that readings will be taken daily, that equipment will be adjusted and that it will be removed when the materials reach the reference. Ask for the drying log at the end. See structural drying for how this works.
Have a scope to review?
Call us and we will explain the lines. If you are not sure whether something is needed, ask.
Exclusions: what is missing
- Mold remediation, if not listed.
- Rebuild items such as paint and flooring.
- Content pack-out or storage.
- Permit fees.
- Plumbing or roof repairs.
- Hidden damage found after demolition.
Exclusions are normal. The problem is exclusions you do not know about. Ask the contractor to list them, and ask how hidden damage is handled. For wall repairs, see wall and drywall water damage.
Why the drying plan deserves your attention
The cheapest line items in a scope are often the equipment days, and the costliest mistake is stopping drying too early. Ask who decides when equipment comes out and what readings they use. If the answer is the end of a set number of days, ask what happens when the readings are not dry yet.
Who to ask when a line is unclear
Start with the contractor and ask for a plain explanation of any line you do not follow, including why it is needed and what happens if it is skipped. If you are unsure, your insurance adjuster can tell you what the policy pays, and a second contractor can tell you whether a scope is typical. Ask questions before you sign, not after the walls come down.
A walk through a basement scope
Imagine a finished basement with two inches of clean water from a failed sump. A sensible scope lists extraction, removal of carpet pad, a flood cut at a measured height on the walls, removal of wet insulation, antimicrobial cleaning of studs and slab, and air movers and dehumidifiers for a stated number of days with daily monitoring. It then lists what is not included, such as new drywall, carpet, paint and baseboards. If a line you expected is missing, ask.
Change orders and sign-off
Hidden damage sometimes turns up after demolition, such as wet framing behind a cabinet. A change order is a short written note describing the added work and its cost, approved before the work happens. Do not sign a blank or open-ended authorization, and ask for a copy of everything you sign. At the end, ask for the drying log, the final moisture readings and a list of removed materials.
Scopes in local homes
Housing data from the Chicago Metropolitan Agency for Planning puts Oswego's median home at 2002 and about 90 percent of housing as single-family. Scopes for these houses often list basement drywall, insulation and carpet pad first, because below-grade finishes take water in first.
If a scope includes electrical or plumbing, the Village of Oswego Building and Permits office at (630) 554-2310 lists permit categories for those trades. Ask who is responsible for permits.
Landlords and property managers can use the same checklist across units. We serve Oswego and nearby towns including Sugar Grove, and the full service area page lists the rest.
Questions readers ask
A document listing the work, areas, materials, equipment, goals and exclusions for a loss.
Linear feet, used for baseboard and cut lines.
Ask how it relates to room size and readings, and request the drying log.
Ask the contractor to add it or list it as an exclusion in writing.
Only if it says so. Ask who pulls permits and call the village Building and Permits office to confirm what applies.